51pML4qMBBL.jpg
Commonwealth military vehicles
sold out

Challenger 2 (Photosniper) Paperback

Sale Price:$24.99 Original Price:$34.95

The introduction into British army service of the Challenger 2 Main Battle Tank (MBT) was originally intended to take a mere eighteen months from design to production, but in the event, it took something closer to ten years. Why this was so is an important part of the Challenger 2 story, and although on the face of it this might seem to be a clear failure, it actually produced the most thoroughly tested and reliable tank ever to enter service with the Royal Armoured Corps (RAC).

The tank has now been in service for twenty years and can be expected to form part of the British army’s inventory – albeit in low numbers – until around 2035, which would make it the longest-serving frontline battle tank ever used by the UK.

Add To Cart
51pML4qMBBL.jpg

Other books you may like:

British Cold War Military Trucks - Bedford TM TM-Series, 4-4 und 6-6 - The Last Bedfords for the British Army  - Tankograd 9029 9029 BedfordTM 02.jpg
sale

British Cold War Military Trucks - Bedford TM TM-Series, 4-4 und 6-6 - The Last Bedfords for the British Army - Tankograd 9029

Sale Price:$26.95 Original Price:$28.95
Tankograd In Detail : Fast Track 18 Challenger 2 Britain's Main Battle Tank
sold out

Tankograd In Detail : Fast Track 18 Challenger 2 Britain's Main Battle Tank

Sale Price:$17.95 Original Price:$19.95
Bedford QL Trucks in Detail Red 084 bedford-ql-trucks-in-detail (1).jpg
sale

Bedford QL Trucks in Detail Red 084

Sale Price:$37.99 Original Price:$42.00
CVR(T) Scorpion - Scimitar - Sabre  - Tankograd 9033 9033 CVRT 02.jpg
sold out

CVR(T) Scorpion - Scimitar - Sabre - Tankograd 9033

Sale Price:$26.95 Original Price:$28.95
Tank Power Vol.CCXVII 483. Cromwell vol. II
sale

Tank Power Vol.CCXVII 483. Cromwell vol. II

Sale Price:$24.99 Original Price:$29.99